Tubi-Tak Projects

Projects

  • Employer:Tehran Oil Refinery

Date: 26 July 2016

Subject : Technical inspection during overhaul of Distillation, liquid gas and South Mraks units

  • Employer:Sarkhoon and Qeshm Gas Refinery

Date: 14 May 2016

Subject : THeat exchanger tube inspection with RFT Eddy Current Method

  • Employer:Petroleum Engineering and Development Company  PEDEC

Date: 13 December 2015

Subject : Technical inspection and protection quality control performance monitoring in PEDEC’s projects

  • Employer:Bandar Abbas Oil Refinery

Date: 10 October 2015

Subject : Performing Phased Array Test on Top Flanges of Isomax Reactor

  • Employer:Saba2-Ahwaz Residential Complex

Date: 11 May 2015

(Subject : Steel Structure Inspection (25% increased

  • Employer:Shiraz Oil Refinery

Date: 6 April 2015

Subject : Inspection of Isomax reactor and A, B, C, F, E 106 heat exchanger

  • Employer:Sarkhoon  and Queshm Gas Refinery

Date: 9 Feb 2015

Subject :Corrosion mapping of Nitrogen package pressure vessels

  • Employer: Azarbayjan Sharghi Power Generation Company

Date: 12 November 2014

Subject : Thickness measurement and identification of damaged portions of water wall boiler tubes, Unit No. 2

  • Employer: IGC

Date: 12 October 2014

Subject : Inspection of piping welds with PAUT/TOFD method

  • Employer: Nardis Energy

Date: 1 October 2014

  Subject : Reconstruction and renovation of Forouzan oil rigs

  • Employer: Gachsaran Oil and Gas Company

Date: 6 September 2014

Subject : Inspection of fittings with PAUT/TOFD method on HIC defects

  • Employer: Oil Industries Engineering and Construction Company

Date: 28 August 2014

Subject : Performing AUT/TOFD tests for south pars projects in Assaluyeh

  • Employer: Oil Industries Engineering and Construction Company

Date: 6 September 2014

Subject : Inspection of fittings with PA/TOFD for south pars projects in Assaluyeh

  • Employer: Shaygan Building

Date: 15 May 2014

Subject : Inspection and quality

  • Employer: Saba 2-Ahwaz commercial and residential complex

Date: 15 May 2014

Subject : Quality control and inspection of welds

  • Employer: Iranian Oil Distribution and Refining Company-Isfahan Pipeline

Date: 12 October 2013

Subject : Inspection of pipelines and above ground and underground storage tanks, consultation and supervision of extracting petroleum and environmental condition monitoring caused by oil leakage to underground water in Isfahan Refinery and its surrounding areas

  • Employer: Arya Sasol Polymer  Yekan Steel

Date: 23 September 2013

Subject : Inspection of 50mm thickness and 1200 meter pressure vessel with PA/TOFD method

  • Employer: Iranian Central Oil Fields Company

Date: 21 August 2013

Subject : Survey and monitoring of PAUT testing on Kangan 42” Pipeline

  • Employer: Tehran Water and Sewage Company

Date: 3 August 2013

Subject : Technical inspection Level I and II for concrete double shell poly ethylene pipes and fittings

  • Employer: Arya Sasol Polymer Company

Date: 12 February 2013

Subject : Eddy Current Testing on LDPE Units

  • Employer: Bandar Abbas Oil Refinery

Date: 20 January 2013

Subject : Inspection with Phased Array and TOFD methods on reactors and high pressure exchangers of the Isomax unit in overhaul

  • Employer: Bandar Abbas Oil Refinery

Date: 7 January 2013

Subject : Non-destructive testing with phased array method

  • Employer: Zobdegan Sanat Joush Company

Date: 1 December 2012

Subject :   Inspection and supervision of CO2 gas transportation from Shahid Tongouyan Oil Refinery

  • Employer: Oil Industries Engineering and Construction

Date: 13 November 2012

Subject : Performing AUT/TOFD for South Pars projects in Assaluyeh

  • Employer: Tehran Metro

Date: 21 October 2012

Subject : Performing Non-destructive testing of rail welds of line no. 3

  • Employer: Aryasolar Chemical Industries

Date: 8 September 2012

Subject : Manufacture supervision and inspection of 9 vessels along with piping

  • Employer: Pars Oil Company

Date: 23 April 2012

Subject : Technical inspection of construction of 6” Lube cut pipeline

  • Employer: Tehran Metro

Date: 18 March 2012

Subject :  Performing NDT test of rails of Line no. 1

  • Employer: Iran Power Plants Repairs Company

Date: 5 March 2012

Subject : Inspection and supervision of C-21 turbine, Tondgouyan Oil Refinery

  • Employer: Municipality of District 18

Date: 3 January 2012

Subject : Quality control of welds of steel structures

  • Employer: Municipality of District 20

Date: 12 December 2011

Subject : Quality control of welds of steel structures

  • Employer: Parsian Sazeh Sepahan Industries

Date: 17 October 2011

Subject : RT testing of storage tanks of south part phase no. 13

  • Employer: Samen Sazeh Arsh Company

Date: 4 October 2011

Subject :  Technical inspection and welding services containing UT, MT, VT

  • Employer: Industries Management Services Center

Date: 11 September 2011

Subject : Inspection procedure and corrosion measurements for tubes of air coolers

  • Employer: Tarh Houshmand Company

Date: 18 July 2011

Subject : RT testing of 2000 capsules

  • Employer: Ofset co-operative housing

Date: 13 July 2011

Subject : Non-destructive testing

  • Employer: Kimidarou Pharmaceutical

Date: 13 July 2011

Subject : Non-destructive testing

  • Employer: Mehr co-operative Housing District 4-4

Date: 13 July 2011

Subject :  Non-destructive testing

  • Employer: Zobdegan Sanat Joosh

Date: 12 July 2011

Subject : Technical inspection of 10” drinking water pipeline Iranol oil company from Tehran refinery

  • Employer: Tehran Sewer

Date: 25 April 2011

Subject : Technical inspection of concrete double shell poly ethylene pipes and fittings

  • Employer: Sanat gostar kish

Date: 9 April 2011

Subject : Non-destructive testing

  • Employer: Arya Sasol Polymer

Date: 21 March 2011

Subject :  Non-destructive testing

  • Employer: Farabard

Date: 21 April 2011

Subject : Weld, paint and insulation inspection of cooling tower

  • Employer: Saba Naft

Date: 14 April 2011

Subject : Welds and fittings quality control

  • Employer: Isfahan Oil Refinery

Date: 11 April 2011

Subject : Inspection of Isomax1 unit reactor with general NDT methods (PT, UT, MT) and advanced ultrasonic methods TOFD and Phased Array

  • Employer: Iran Marine Industries (Urumiyeh Sadra)

Date: 21 March 2011

Subject :  Weld non-destructive testing, PT, MT, UT, advanced ultrasonic and thickness measurement

  • Employer: Iran Marine Industries (Urumiyeh Sadra)

Date: 8 December 2010

Subject : Non-destructive testing of welds, PT, MT and advanced ultrasonics and thickness measurements

  • Employer: Oil Industry Company

Date: 28 July 2010

Subject : Welds and fitting quality control

  • Employer: Imam Khomeini Kesht o Sanat Company

Date: 21 July 2010

Subject :  Technical Inspection of sugar company

  • Employer: Neka Power generation management

Date: 3 March 2010

Subject : Remaining life assessment of turbines, boilers in overhauls

  • Employer: Saba Naft Oil Engineering and Construction

Date: 28 February 2010

Subject : Weld and fitting quality control

  • Employer: Tehran Metro

Date: 4 February 2010

Subject : UT, MT, VT of approximately 2000 welds

  • Employer: Saba Naft Oil Engineering and Construction

Date: 29 January 2010

Subject : Welds and fittings quality control (Saba 2-Ahwaz residential complex-Kianpars) while manufacturing and installation

  • Employer: South Pars gas complex

Date: 21 January 2010

Subject :  Annual services for inspection and corrosion control

  • No.12 , Oskou St, Enqelab St,Tehran,IRAN
  • +98 -21-66174082,66406533
  • +98 -21-66174094
  • info@tubi-takacademy.com
بالا